From: Predicting key features of a substation without monitoring

Fig. 1

Nine different summary measurements (response variables) from the half-hourly electricity load, over 104 weeks, of 135 substations in Bracknell, UK. The actual value for the response variable R1,…,R9 for each substation (grey) ordered by increasing size (to indicate distribution), along with the corresponding prediction (empty circle) from the model specified by (1) and Table 1.The x-axis relates to the substations (which are ordered differently for each subplot so that the response variables ascend)